KViT
Poultry Farm Heating 500 kW
Postoliivka, Ternopil Region500 кВтCompleted: 2024-01

Poultry Farm Heating 500 kW

Project Overview

Installation and launch of a stationary boiler room for poultry farm heating. Kronas boiler with KVIT Optima Mega 500 kW burner, PLUM ecoMAX 850 automation, condensation prevention system and stainless steel chimney.

This installation demonstrates our commitment to providing efficient and sustainable heating solutions. The system was designed to meet specific client requirements for reliability and automation.

Results

  • Significant reduction in heating costs
  • Fully automated operation requiring minimal supervision
  • Stable temperature control regardless of weather conditions

Equipment Installed

Interested in a similar solution?

Contact our engineers for a free consultation and calculation.

Get Consultation