KVIT
Hospital Boiler Room Modernization
Kyiv Region27 кВтCompleted: 2024-04

Hospital Boiler Room Modernization

Project Overview

Modernization of hospital heating system to reduce costs without lowering temperature. DTM 25 kW boiler with KVIT Lyuta 27 burner, PLUM ecoMAX automation, BPU 04 hopper, gas analysis and SMS notification system.

This installation demonstrates our commitment to providing efficient and sustainable heating solutions. The system was designed to meet specific client requirements for reliability and automation.

Results

  • Significant reduction in heating costs
  • Fully automated operation requiring minimal supervision
  • Stable temperature control regardless of weather conditions

Equipment Installed

Interested in a similar solution?

Contact our engineers for a free consultation and calculation.

Get Consultation
Тех. поддержка