KVIT
Industrial Heating 400 kW
Poltava Region400 кВтCompleted: 2019-11

Industrial Heating 400 kW

Project Overview

Installation of a boiler room with ALTEP 400 kW boiler and KVIT Mega 400 burner for industrial heating. The system runs on wood and agro pellets.

This installation demonstrates our commitment to providing efficient and sustainable heating solutions. The system was designed to meet specific client requirements for reliability and automation.

Results

  • Significant reduction in heating costs
  • Fully automated operation requiring minimal supervision
  • Stable temperature control regardless of weather conditions

Equipment Installed

Interested in a similar solution?

Contact our engineers for a free consultation and calculation.

Get Consultation
Тех. поддержка