Kharkiv150 кВтCompleted: 2022-03
Printing House Heating 2000+ m²
Project Overview
Installation of a boiler room for heating a printing house over 2000 m² with KVIT Optima 150 kW burner. Automatic maintenance of stable temperature for the printing process.
This installation demonstrates our commitment to providing efficient and sustainable heating solutions. The system was designed to meet specific client requirements for reliability and automation.
Results
- ✓Significant reduction in heating costs
- ✓Fully automated operation requiring minimal supervision
- ✓Stable temperature control regardless of weather conditions