KVIT
Production Facility Heating 1300 m²
Kharkiv100 кВтCompleted: 2022-06

Production Facility Heating 1300 m²

Project Overview

Pellet boiler room for a 1300 m² production facility with KVIT Optima P 100 kW burner. Full process automation with remote monitoring.

This installation demonstrates our commitment to providing efficient and sustainable heating solutions. The system was designed to meet specific client requirements for reliability and automation.

Results

  • Significant reduction in heating costs
  • Fully automated operation requiring minimal supervision
  • Stable temperature control regardless of weather conditions

Equipment Installed

Interested in a similar solution?

Contact our engineers for a free consultation and calculation.

Get Consultation
Тех. поддержка